Our sink arrived. The poor UPS guy had to schlep what’s labeled ‘team carry’ pkg up two sets of steps.
We have much of the ceiling painted. Some of the walls. We have the broom closet mostly built.

We are gaining weight from fast food and from the fact I’m cooking in a microwave mostly.

We have yet to lay the floor or finish the walls and have no cabinets or sink. Spaghetti water gets emptied into the tub drain.

Food prep area is, oh, about 2×2, meaning the top of the range. Or 8″x8″ if near the coffee pot.